How do I arrange a site visit and what will happen afterwards?
|
|
Please contact us via telephone or email and we will be more than happy to help!
|
| |
|
Site visits, paint shop design and planning are all carried out in-house by ourselves. Detailed technical drawings will be provided together with our written quotation for the project and detail of how to proceed with your order. Our equipment is standardised in its design to ensure consistence in quality. Therefore your order will arrive directly from the NOVA VERTA factory in Italy usually within a four week time frame.
|
| |
|
How long will a typical new Spray Booth installation take?
|
|
We endeavour to turn a project around for a single Spray Booth installation within five working days, subject to the necessary services being available. This may take a little longer subject to any additional options chosen at the time of ordering.
|
| |
|
What are my plant options for Spray Booth extraction?
|
|
We can provide under-floor extraction in two ways. By means of a pit excavation (works to be completed by others) to provide a level vehicle entrance or, if excavation is not a preferred option, we can mount the Spray Booth on its own raised platform section with either an internal or external vehicle ramp. We also provide side and rear extraction plants.
|
| |
|
What are my plant options for Spray Booth heating?
|
|
Gas, LPG or Oil fired high efficiency burners are used throughout our Spray Booth range to achieve fast Spray and Bake temperatures for all waterborne and solvent based paints and lacquers.
|
| |
|
What services will I need to provide?
|
|
Electrical power requirements:
|
|
• Three Phase and Neutral
|
|
Fuel running requirements:
|
|
• NATURAL GAS
|
|
• LPG
|
|
• OIL
|
|
Compressed air supply
|
|
Roof penetrations and weather-proofing of ductwork
|
| |
|
Do Nova Verta Spray Booths comply with manufacturers recommendations?
|
|
Yes, this has been achieved by all major manufacturers and we are fully EC ans ISO9001 compliant. Full compliance documentation including Spray Booth operations will be provided on completion of installation.
|
| |
|
The booth is still working isn't it, why would I want to spend money on filters and service?
|
|
To begin with, it's a legal requirement to have a booth inspected twice a year to achieve vital EPA certification. It is also proven that the efficiency/maintenance/profitability ratio is so important that premium service contracts are well worth the small investment.
|
| |
|
Why should I use genuine Nova Verta filters and spare parts?
|
|
Other non-legal filters are of course cheap to purchase. However, not only are they illegal, they do not work properly, usually allowing the paint through to the fans which then need a more expensive service to recover.
|
| |
|
NOVA VERTA parts are competitively priced and are kept available from stock so you can be assured of the very best service and maintenance support for your Spray Booths.
|
| |
|
How quickly can I obtain spare parts and filters?
|
|
All parts are kept in stock from our centralised warehouse facility. Goods will be dispatched overnight by our courier with either a pre-9am, pre-10am, pre-12pm or standard next day service and Saturday delivery service.
|
|

|